Womble Gate Construction

Dates : 20 – 31 Oct 2014

Times : 0830-1600 (Mon – Fri Only)

A pedestrian awning will be installed over the Womble Gate Pedestrian entry control point

The far right lane will be used for pedestrian base entry/exit.

Middle lane will be used for vehicular exit only from 0830-1600

womble gate

This entry was posted in Uncategorized. Bookmark the permalink.